‘Foshan’ Shimen Practical Middle School Library Renovation Project 

Team Work(4 memebers): Nie Wenhao, Gao Xinyuan, Zhao Zibo, Wang Ding 
Design Leader: Nie Wenhao
Location: Foshan,Guangdong
Renovation Project: about 300 sqm
Built: March 2021

Foshan shimen experimental middle school is a very superior to the local international schools, library as a school is one of the earliest construction is now under the needs of students, so the principal entrusts designer converted on the basis of the existing 600 square meters, will function from a single place to borrow books also converted into leisure, display, viewing and collection, etc.The design in the lowest construction cost to achieve the best effect of the design of the upper and lower two floors.The overall construction cost is about 800,000 RMB and has been completed in March 2021.